|

CSSI
Designs and Installs New Rigging System at Chicago's United Center
CSSI designed
and installed a new rigging and drapery system at Chicago's United
Center that allows the arena to black out certain seating areas
to provide varying levels of intimacy as required for different
types of shows including small concerts, theatrical productions
and business presentations. CSSI also installed an audience lighting
system that provides dimmable house lights to be used in place of
the existing system that allows only two options: on and off.
Project Manager
Ken Zommer worked with Jim Koehler, Terry Savarise and John Zirin
of the United Center to provide full-service contracting, installation
and supervision for the entire project.
|