| 
Ornate Set
Featured in Marriott's The King and I
CSSI built the
ornate set and props for Marriott Lincolnshire Theatre's recent
production of The King and I. The show's two pagodas were designed
to have transparent paper sides, roofs and columns that were hollow
cast to allow light to shine up through the entire structure. CSSI
also built two flying arches that were adorned with gold and jewels.
The elaborately painted floor incorporated three computer-controlled
hydraulic lift platforms.
Project Manager Mark Ewing worked with Marriott's Dyanne Earley
and Tom Ryan, the show's designer, to complete the project on time
and on budget.
Click here
to read more about Chicago's ongoing work with the Marriott Theatre
in Lincolnshire, Illinois.
<<Back
to Theater/Live Events
<<Back to Fall 2000 Newsletter
|